Project

SYUNIK CORRIDOR

Float Image
Float Image
Float Image

Length

35 Km

Float Image

Structure

2 Band hanging Freeway

Float Image

Crossing Time

35 min

Float Image

Project cost

$ 2.5 Billion

Float Image
Float Image

Why Syunik Corridor ?

The Syunik Corridor is a project that can satisfy both Azerbaijan and Armenia on a solution that can connect Azerbaijan to its Exclave of Nakhichevan on an "extra territorial" basis without infringing Armenia's territorial integrity or intersecting with the North-South corridor that connects Iran with Georgia.

It is not only a matter of connecting Azerbaijan with Nakhichevan, but also an essential part of the Silk Road connecting Asia with Europe and the Middle East.

Even if operated on a toll collection basis, it can save significant time and fuel for all vehicles crossing the mountainous region of Syunik in under 45 minutes, compared to the regular roads of about 200 Km and an average of 5 hours crossing time, not to mention customs formalities and waiting time at the border.

The revenues from the tolls can be shared between the foreign investments and the Government of Armenia on an ROI basis of 8 % / year, and a concession period of 30 years.

Float Image
syunik corridor longest version
Float Image

Project Summary

🛣️ 1. Project Overview

Route length 35 km (~22 miles)

Lanes 4 (2 per direction)

Design Fully elevated ("hanging")

Terrain: Mountainous, seismic zone

Purpose: International transit corridor

🏗️ 2. Construction Cost Estimate

Estimate (USD) Base cost per km (elevated) ~$60 million/km

Total base cost 35 km × $60M = $2.1B

Add 20% for tunnels, security, seismic, etc. $420M . 

Total estimated cost ~$2.5 billion USD

💰 3. Toll Revenue

🎯 Target ROI: Assume 8% annual return on investment

ROI target = $200 million/year

O&M cost (3% of CAPEX) = $75 million/year

Total needed per year = $275 million

🚗 4. Traffic Assumptions Scenarios

Vehicles/day Annual traffic

Conservative 10,000 3.65 million

Moderate (likely) 20,000 7.3 million

Maximum realistic 40,000 14.6 million

💵 5. Toll Fee Estimates (for $275M/year target)

Daily Traffic Veh./year

10,000 3.65M

Required Avg Toll $75

Daily Traffic Veh./year

20,000 7.3M

Required Avg Toll $37

Daily Traffic Veh./year

40,000 14.6 M

Required Avg Toll $18.85

🚚 Tiered Toll Suggestion (Moderate Volume: 20,000/day)

Vehicle Type : Cars

Share 60%

Vehicles/year 4.38M

Toll : $20

Revenue $87M

Vehicle Type: Vans/Buses

Share 20%

Vehicles/year 1.46M

Toll : $40

Revenue $58M

Vehicle Type: Cargo Trucks

Share 20%

Vehicles/year 1.46M

Toll : $90

Revenue $130M

Vehicle Type Share Toll Vehicles/year Revenue

Total Vehicles/year: 7.3M

Total Revenue $275M ✔

✅ Final Summary

Route length 35 km

Estimated construction ~$2.5 billion

Annual revenue target ~$275 million

Average toll (20K/day) ~$37.70/vehicle