Project
SYUNIK CORRIDOR
Length
35 Km
Structure
2 Band hanging Freeway
Crossing Time
35 min
Project cost
$ 2.5 Billion
Why Syunik Corridor ?
The Syunik Corridor is a project that can satisfy both Azerbaijan and Armenia on a solution that can connect Azerbaijan to its Exclave of Nakhichevan on an "extra territorial" basis without infringing Armenia's territorial integrity or intersecting with the North-South corridor that connects Iran with Georgia.
It is not only a matter of connecting Azerbaijan with Nakhichevan, but also an essential part of the Silk Road connecting Asia with Europe and the Middle East.
Even if operated on a toll collection basis, it can save significant time and fuel for all vehicles crossing the mountainous region of Syunik in under 45 minutes, compared to the regular roads of about 200 Km and an average of 5 hours crossing time, not to mention customs formalities and waiting time at the border.
The revenues from the tolls can be shared between the foreign investments and the Government of Armenia on an ROI basis of 8 % / year, and a concession period of 30 years.
Project Summary
🛣️ 1. Project Overview
Route length 35 km (~22 miles)
Lanes 4 (2 per direction)
Design Fully elevated ("hanging")
Terrain: Mountainous, seismic zone
Purpose: International transit corridor
🏗️ 2. Construction Cost Estimate
Estimate (USD) Base cost per km (elevated) ~$60 million/km
Total base cost 35 km × $60M = $2.1B
Add 20% for tunnels, security, seismic, etc. $420M .
Total estimated cost ~$2.5 billion USD
💰 3. Toll Revenue
🎯 Target ROI: Assume 8% annual return on investment
ROI target = $200 million/year
O&M cost (3% of CAPEX) = $75 million/year
Total needed per year = $275 million
🚗 4. Traffic Assumptions Scenarios
Vehicles/day Annual traffic
Conservative 10,000 3.65 million
Moderate (likely) 20,000 7.3 million
Maximum realistic 40,000 14.6 million
💵 5. Toll Fee Estimates (for $275M/year target)
Daily Traffic Veh./year
10,000 3.65M
Required Avg Toll $75
Daily Traffic Veh./year
20,000 7.3M
Required Avg Toll $37
Daily Traffic Veh./year
40,000 14.6 M
Required Avg Toll $18.85
🚚 Tiered Toll Suggestion (Moderate Volume: 20,000/day)
Vehicle Type : Cars
Share 60%
Vehicles/year 4.38M
Toll : $20
Revenue $87M
Vehicle Type: Vans/Buses
Share 20%
Vehicles/year 1.46M
Toll : $40
Revenue $58M
Vehicle Type: Cargo Trucks
Share 20%
Vehicles/year 1.46M
Toll : $90
Revenue $130M
Vehicle Type Share Toll Vehicles/year Revenue
Total Vehicles/year: 7.3M
Total Revenue $275M ✔
✅ Final Summary
Route length 35 km
Estimated construction ~$2.5 billion
Annual revenue target ~$275 million
Average toll (20K/day) ~$37.70/vehicle